Table 1. Reportable Pipeline Occurrences, July 2025

 

July

Year to date (July)

 

2025

2024

2020-2024
average

2025

2024

2020-2024
average

Total number of occurrences5109344043
Total number of occurrences with product release02312713
Total number of serious injuries000000
Total number of fatalities000000
Accidents000011
Product released000011
Release of hydrocarbon gas000010
Release of HVP hydrocarbons1000000
Release of LVP hydrocarbons2, 3000000
Release of other product000000
Release from line pipe body000011
Fire/Ignition000010
Explosion000010
Rupture000011
Pipeline contacted by object000000
Operation beyond limits000000
Geotechnical/Hydrotechnical/Environmental activity000000
Incidents5109343942
Product released02312612
Release of hydrocarbon gas0121148
Release of HVP hydrocarbons1000000
Release of LVP hydrocarbons2, 3011123
Release of other product000001
Release from line pipe body001112
Fire/Ignition112545
Explosion100221
Pipeline contacted by object021888
Operation beyond limits000284
Geotechnical/Hydrotechnical/Environmental activity33351010
Unauthorized 3rd-party activity affects pipeline structural integrity001214
Data extracted 15 August 2025      

NOTES:

1 HVP means high vapour pressure as defined in Canadian Standards Association Standard Z662.
2 LVP means low vapour pressure as defined in Canadian Standards Association Standard Z662.
3 As of July 2014, the minimum reporting threshold for releases of low vapour pressure hydrocarbons was established at 1.5m3.